亚洲综合日韩在线亚洲欧美专区,国内精品久久久久影院蜜芽,国产精品亚洲影视97久草,精品在线观看视频在线

Navigation

Sewage project case

TYPICAL CASES OF BOT PROJECT AND ENGINEERING CONSTRUCTION
Author:Dongda Environment Time:2020-12-27 Clicks:206

TYPICAL CASES OF BOT PROJECT AND ENGINEERING CONSTRUCTION

2500m3/d Electroplating wastewater treatment and reuse project
The project covers an area of about 10500 square meters. The treatment object is electroplating park wastewater. The treatment capacity is designed to be 2500m3/d. The reuse rate of reclaimed water at the end of the wastewater treatment station is more than 50%. The quality of treated effluent meets the standard of Table 3 of (GB21900-2008).
Treatment process: the project adopts classified collection and treatment, and is sent to the regulation system pool through physical and chemical pretreatment, electrochemistry, FBCOT advanced oxidation, membrane process and other process systems.
2500m3/d Electroplating wastewater treatment and reuse project
1000m3/d School domestic sewage treatment project
The project was put into operation in September 2013. Using AO3-MBR process, the treated water quality can meet the (GB 18918-2002).
Treatment process: Septic tank - Regulating tank - A2O - MBR tank - Clear water tank.
The process of this project has the advantages of compact structure, small floor area, high treatment efficiency, good effluent quality, less excess sludge, easy to realize automation, convenient operation and management.
1000m3/d School domestic sewage treatment project

Whatsapp Phone QR code

Telephone

0086-0575-87139000

Scan and follow us